You can download all our catalogue and price lists from the following links:
Catalog:https://drive.google.com/drive/folders/10tB0eBmf037-TTX6HrPz2fPl_fCEgv7m?usp=drive_link
Price list:https://drive.google.com/drive/folders/1GAXno2WooOqBBeWdwNc41yEcQ1frAePA?usp=drive_link
INSTALLATION:
1: Check whether the products are damaged after arrival.
2: Cutting: toothless saw/tile cutting saw, cutting on the back, so as not to damage the surface color, etc.;
3: Repair: first fill the gap with repair agent, and then brush the color paste
4: Construction: construction level measurement wall flatness, box ruler measurement installation position, flat cement wall can be directly structuring adhesive paste, paste good and then fixed with air nails, uneven w-all with woodworking board, on the back of the product coated with structural adhesive paste can be.
5: FRP material has a certain toughness can do 45°arc.