Installation:
1. Base leveling treatment
2. Sealing primer (optional)
3. Brick arrangement, grid division, and line snapping
4. The adhesive on the back of the product is fully coated or scraped into a comb shape
5. Flexible stone products, flattened and pressed
6. Use specialized pointing agent for caulking
7. Wall treatment
8. Glazed topcoat (optional)
Reviews
There are no reviews yet.