INSTALLATION:
1.Primary treatment: Install steel frame and channel steel column.
2.Welding the keel beam: According to the height of the transparent concrete, the 5mm*5mm beam Angle steel is welded on the column (the horizontal plane of the panel can be adjusted by the fine-tuning bolts on both sides of the column, and then welded firmly).Considering the thickness of the bow buckle(about 5mm)and the height of the caulk, the keel layer height from the second layer should be more than the height of the transparent concrete plate reserved 7mm-10mm.
3.Hoisting vertical line: From the top of the curtain wall hanging longitudinal plane line, this plane line can be selected in the right corner position of the curtain wall plane
4.pull horizontal line: according to the design and construction of the actual situation to determine the bottom edge of the stone wall, between the two strong straight line pull a horizontal line and block line, horizontal line and vertical line to determine the curtain wall plane.
5.Installing Pendants: Each layer of beam will be fastened to the Angle steel beam through bolts.
6.hangs Taiwan: Metope USES trowel mansion base coating a layer of paste mortar leveling render, hangs Taiwan after 1 hour, remove the hook of the insert into 1 layer 1 piece of pervious to light the grooving on top of the concrete board, adjust the bolt, the pervious concrete plate vertically, with straightedge plate and wedge fixed panel after leveling, again in accordance with the order 2 pieces,3 pieces of the same, when hung 2 layer board each piece after all is in place, Check whether the upper mouth is level, if the surface of the plate is uneven, Can be in the bottom of the plate on the bow buckle on the corresponding double copper wire pad leveling, each installed five layers of plate, the wire check once, in order to eliminate the erroring time. Finally, the marble glue is injected into the cutting groove to solidify and position, and the third layer and the fourth layer are successively hung.
7.iointing: Sealant mortar is applied after rubber or foam strips are filled between the joint of two layers of transparent plate. Hook horizontal seam first, then cross seam, seam depth should be the same.
8.Finish cleaning: Clean the dirt on the finish with a rag; Use a knife or hand-held polisher to polish uneven concrete finishes.