INSTALLATION:
The construction surface must be dry and clean.
1.Ready to use right out of the can, no need to dilute and stir, please test a small amount before operation and then paint on a large surface.
2.Soft bristle roller brush, saturated for a layer of stone surface.
3.After construction, it can be cured for more than 24 hours to avoid bumps and dust pollution, and the film protection can be added according to the site conditions.
Reviews
There are no reviews yet.