INSTALLATION:
1.Cut and hem: cut and hem according to the actual size on site before installation.
2.Bottom grooving: the wall using the base plate bottom, the top Surface using light steel’ keel bottom, grooving in the corresponding fold position as to install.
3.Installation: Fix the water corrugated plate with folded, edges on the bottom, plate with structural glue; The Seam joining together
4.Reinforcement: After the top surface is installed, the stick should be supported and strengthened, and the stick should be removed after the glue is cured.
Reviews
There are no reviews yet.